Our Services
BIM
BIM is at the core of our design processes and is used from the very start of a project, right through to handover. 100% of our projects are modelled, enabling us to understand sites better and to ensure coordination is effective. Having 3D modelled our projects for over 15 years, our BIM transition was a natural progression.
All of our design staff are BIM trained and use it daily – we have no split between designers and technical staff. We also have several years’ experience working on ISO 19650 project workflows (formerly ‘Level 2’ projects) with IFC and COBie handover.
We publish a BIM blog and have a full suite of accredited BIM standards and procedures. We were early adopters of VR headsets, walkthrough software and cloud rendering.
Working with BIM and instant rendering technology allows us to rapidly iterate our designs for clients, to achieve sign-off more quickly. We give our clients a far better understanding of their buildings than was previously possible. There is no ‘overhead’ to visualisation of our projects because it is fully integrated into our design workflow.
We publish a BIM blog and have a full suite of accredited BIM standards and procedures. We were early adopters of VR headsets, walkthrough software and cloud rendering.
Working with BIM and instant rendering technology allows us to rapidly iterate our designs for clients, to achieve sign-off more quickly. We give our clients a far better understanding of their buildings than was previously possible. There is no ‘overhead’ to visualisation of our projects because it is fully integrated into our design workflow.
Collaborating in 3D allows us to achieve better and earlier coordination of the discipline models. Steelwork and services clashes in particular are a common source of site delays and re-designs, and BIM allows us to pick up clashes before the project hits site. Better coordination saves time and money.
Collaborating in 3D allows us to achieve better and earlier coordination of the discipline models. Steelwork and services clashes in particular are a common source of site delays and re-designs, and BIM allows us to pick up clashes before the project hits site. Better coordination saves time and money.
We use Enscape, TwinMotion and Lumion software for walkthroughs and presentations, and 3DS Max for photo-real rendering. We have an internal PIM (Project Information Management) system and an internal DMS (Document management System) using Deltek PIM. We are also experienced at working on 3rd party CDEs, such as Viewpoint 4 Projects.
Information Management: CDE hosting and management, BEP authoring and project set up, including LOD and DRM, tables, TIDP templates, hosting and chairing model meetings, BIM capability assessments, defining and managing exchange processes.